Address

Via Mantovana, 173 - 37137 VR

Mail

info@trombamaurizio.it

Telephone

+39 045 51 31 12

Pipes for oil and gas-pipelines

Calendering and bending of pipes for the building of oil- and gas-pipelines.
We calender tubes up to 40cm, that can be as thick as 50 mm; we also know how to calender tubes covered with neoprene, without damaging the surface layer.
On request our curvature can match the 3% mark of ovality of the pipe section.

Altre Lavorazioni